Search BSI Knowledge
Cookie Settings
BS 1113:1989 | 1 Jan 1989 | BSI Knowledge
Standard
Withdrawn
BS 1113:1989
Specification for design and manufacture of water-tube steam generating plant (including superheaters, reheaters and steel tube economizers)
Published:
1 Jan 1989
•
Withdrawn:
2 Jan 1992
Overview
Preview
References
History
Visit the preview section for more information
Product Details
Descriptors
Sheet materials
Inspection
Bending stress
Safety valves
Elongation at fracture
Pressure equipment
Boiler tubes
Heating equipment
Metal sections
Heaters
Flaws
Castings
Assembling
Pipes
Steam heaters
Steam engineering
Equations
Pressure pipes
Testing conditions
Heat treatment
Heat engineering components
Pressure gauges
Dimensions
Welding
Shell structures
Design calculations
Temperature
Marking
Flow nozzles
Non-destructive testing
Life (durability)
Working stress
Economizers
Pressure testing
Drums (containers)
Thickness
Cylindrical shape
Design
Stress
Acceptance (approval)
Pipe fittings
Boilers
Bars (materials)
Defects
Steam boilers
Liquid-level indicators
Pressure vessels
Stop valves
Steels
Valves
Water-tube boilers
Loading
Forgings
Stress analysis
Pipe couplings
Inclusions
Acceptance inspection
Steam plant
Welded joints
Joints
Fusion welding
Gauges
Hydraulic tests
ICS Codes
27.040 Gas and steam turbines. Steam engines
Committee
PVE/2
International relationships
—
ISBN
0 580 17141 8
Publisher
BSI