NOTE 1 For this document, the term “boiler” is applicable for generator and/or assemblies.
NOTE 2 The maximum time of operation without manual (human) intervention can be specified for each boiler system.
NOTE 3 Annex C gives recommendations of operation and testing of the boiler system with a maximum time of operation without manual (human) intervention of 24 h and 72 h.
EN 12953-6