1 Scope
The scope of this Technical Report is to define a method to determine the required
Safety Integrity Level of railway signalling equipment taking in consideration
The following picture may be used in order to detail more precisely the scope of this Technical Report:
Figure 1.1
—
Scope of WG A10
From a mechanistic point of view the task of this Technical Report is to define a
method of calculation, which determines the integrity requirements (qualitatively
and quantitatively) from the inputs stated above.