This document specifies a practical procedure to create and verify distance-speed diagrams and speed curves using the parameters specified in ISO 24675‑1, from which the shortest running time for railway timetabling is obtained by numerically integrating the speed curves.
This document excludes running time calculation used for purposes other than timetabling.
ISO 24675-2