Search BSI Knowledge
Cookie Settings
BS 9364 N017:1979 | 15 Jan 1979 | BSI Knowledge
Standard
Withdrawn
BS 9364 N017:1979
Detail specification for low power silicon n-p-n switching transistors. 65 V, planar epitaxial, ambient rated, hermetic encapsulation (long lead version). Full plus additional assessment level
Published:
15 Jan 1979
•
Withdrawn:
2 Aug 2013
Overview
Preview
References
History
Visit the preview section for more information
Product Details
Descriptors
Approval testing
Bipolar transistors
Electronic equipment and components
Quality assurance systems
Transistors
Rated voltage
Switches
Assessed quality
Epitaxial layers
Inspection
Qualification approval
Dimensions
Semiconductor devices
Switching circuits
Design
ICS Codes
31.080.30 Transistors
Committee
EPL/47
International relationships
—
ISBN
0 580 10700 0
Publisher
BSI