Search BSI Knowledge
Cookie Settings
BS 9364 N008 and N010:1978 | 15 Jul 1978 | BSI Knowledge
Standard
Withdrawn
BS 9364 N008 and N010:1978
Detail specification for low power silicon n-p-n switching transistors. 20 V, planar epitaxial, ambient rated, hermetic encapsulation (long lead version). Full plus additional assessment level
Published:
15 Jul 1978
•
Withdrawn:
2 Aug 2013
Overview
Preview
References
History
Visit the preview section for more information
Product Details
Descriptors
Bipolar transistors
Switches
Inspection
Electronic equipment and components
Design
Semiconductor devices
Switching circuits
Approval testing
Dimensions
Transistors
Epitaxial layers
Qualification approval
Rated voltage
Quality assurance systems
Assessed quality
ICS Codes
31.080.30 Transistors
Committee
EPL/47
International relationships
—
ISBN
0 580 10315 3
Publisher
BSI