BS 6031 Best practice guidance on geotechnical aspects of earthworks and on working practices
Earthworks are:
1) Structures formed by the excavating, raising or sloping of ground, e.g. embankments, cuttings or remediated natural slopes
2) Civil engineering process that includes extraction, loading, transport, transformation/improvement, placement and compaction of natural materials (soils, rocks), and/or secondary or recycled materials, in order to obtain stable and durable cuttings, embankments or engineered fills
Earthworks are commonly associated with transport infrastructure, but there are many other important applications:
BS 6031 gives recommendations and guidance for unreinforced earthworks forming part of general civil engineering construction, with the exception of dams. It also gives recommendations and guidance for temporary excavations such as trenches and pits.
BS 6031 reflects the actual processes that might be followed on a typical project to deliver the earthworks. In practice earthworks design is an iterative process where the employer, consultant, main contractor, sub-contractors and construction validation team often take design decisions. To reflect this situation BS 6031 includes some subjects in more than one clause.
This revision of BS 6031 reflects the widespread UK practice of using the Specification for Highway Works (SHW) 600 series for the construction of earthworks. Within this standard, the SHW has been set as the default approach for earthworks specification that applies unless the designer details an alternative form of specification/earthworks management system.
This edition of BS 6031 is set out in clauses to reflect the overall earthworks process: where earthworks are planned, designed, constructed, adopted/approved following construction, and then the earthworks moves into an asset management process. This cycle is only broken when the earthworks reach the end of their useful life and are decommissioned. BS 6031 recognizes that construction of new earthworks and the remediation or repair of existing earthworks are activities that have similarities and significant differences. Wherever possible, clauses cover both construction and remediation activities, which need to be taken into consideration as appropriate.
This version of BS 6031 replaces the 1981 version, which is now obsolescent.
This version of BS 6031 brings it into line with BS EN 1997-1:2004. The style adopted within BS 6031 is to cross-reference BS EN 1997-1:2004 (not repeat it). BS 6031 is non-conflicting complementary information (NCCI) to BS EN 1997-1.
Contents of BS 6031: